Details: supply of earth including earthwork in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions by mechanical transport within 10 km. lead and lift upto 1.5m. including royalty. supplying of empty cement bags at kirari for use of flood fighting purpose and for other missc. works including loading, unloading, rehandling and stacking. supply of 60mm dia safeda ballies 3 m long. filling of empty cement bags with earth including stitching & stacking complete as per instruction of engineer-in-charge. carriage of filled cement bags from kirari to on various sites as per requirement including loading, unloading and stacking and complete as per instruction of engineer-in-charge. hiring of jcb machine on hourly basis
Sector: Irrigation