Details: hiring & running of 30 hp waste water/ sewage dewatering pump-set with all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length upto 50 mtrs approx. (i/c welding & cutting of ms pipe etc.), nrv, cable, etc as per site requirement. the work also includes operation of p/set round the clock, watch & ward etc. by deploying one semi-skilled & one un-skilled staff in each shift. the work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin shed) for operational staff etc. as per direction of engineer-in charge.note :-electricity will be provide by the department.period :- 120 days x 3 = 360 shifts
Sector: Water supply and Sewerage