Description: Comprehensive Maintenance of various roads under PWD Division South Road II during 2025 26 and 2026 27 SH Thermoplastic and Synthetic Enamel Paint work under Sub Division I and IV Name of Work Comprehensive Maintenance of various roads under PWD Division South Road II during 2025 26 2026 27 SH Thermoplastic Synthetic Enamel Paint work under Sub Division I IV
Details: DSR 2023 (Civil) Items Finishing walls with Acrylic Smooth exterior paint of required shade: Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. Modified Estimated Cost after using Correction factor on DSR 2023 on account of GST @ 0.973 = (50624303 x 0.973 = 49257447) = (50624303 – 49257447 = 1366856)= (-) 1366856 Add Cost Index @ 3% (On DSR Item) Non DSR Items Painting with synthetic enamel paint on
Sector: PWD