Details: earth workexcavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : all kinds of soil 1.1) pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm. dismantling and demolishingdemolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. 2.1) nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of engineer-in-charge. road workproviding and laying dense gr
Sector: PWD