Details: initial desilting of pwd's open / covered / pipe / rcc box / brick drains and culverts etc. by deploying labour / supersucker / pumps / jetting machines / any other suitable mechanical means including opening/closing/placing/refixing of manhole cover/sfrc cover/drain cover, taking out silt, sludge, building , earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ and its final disposal to authorised mcd/any other dumping ground as approved by engineer-in-charge upto15th june 2025. the rates includes all above operations including opening/closing/placing/refixing of manhole cover/sfrc cover/drain cover, taking out silt / floating material / malba / waste materials etc. from the drains / culverts, keeping it adjacent to drains for its drying (if required/ allowed by engineer-in-charge), its disposal to any temporary dumping ground (if required/ allowed by engineer-in-charge) and its final disposal to mcd/any other dumping ground, as approved by engineer
Sector: PWD