Details: installation, round the clock operation having 1 no. suitable staff in each shift as per site requirement, watch & ward of pump set with all the electric accessories, like cable panel suction & delivery of suitable size (6” and 4”) tin shed barricading shall be in the scope of firm. pump set will be provided by the department period 3 month.
Sector: Water supply and Sewerage