Details: monthly maintenance of the drain to keep it clear throughout the month. supplying and installation of floating trash barrier 1.50 m height as per speicifications and drawings complete in all respects for controling trash in flowing waters at various locations as per directions of engineer-in-charge. the barrier shall be anchored side slopes of drain. disposal of silt other waste material available from after cleaning of the drain by mechanical means including loading, transporting, unloading, rehandling including excavation of dumped floating material working under foul condition (if any) etc. complete to rise eleven bakkarwala, sanitary land fill/authorised dumping ground with all leads and lifts etc. complete upto entire satisfaction of engineer-in-charge. (processing fee deposited /paid by contractor to rise eleven bakkarwala, sanitary land fill/authorised dumping ground in actual basis to be reimnbursed to contractor by deptt. seperately and same is not included in the rate of this
Sector: Irrigation