Details: dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge. dismantling tile work in floors, roofs and wall linings laid in cement mortar or fixed with fasterners/pins including stacking material within 50 metres lead. : for thickness of tiles 10 mm to 25 mm dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinfor
Sector: Urban Authority