Details: demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement morta removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured):from brick work in cement mortar brick work with available bricks in superstructure above plinth level : cement mortar 1:6 (1 cement : 6 coarse sand). disposal of moorum/ building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of engineer-in-charge boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade m-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the c
Sector: Irrigation