Details: desilting of drain/removal of silt earth/manure/sludge etc. from the bed of escape drain no. ii in the entire width of drain and under all existing culverts (including working in foul condition) upto desired level using suitable, adequate and latest technology by manual and mechanical (all types of excavators) means as per site requirement without obstructing the flow of the drain including levelling and dressing on the bank/berm with all lead & lifts as per site requirement and directed by engineer-in-charge. disposal of silt, other waste material available from after cleaning of the drain by mechanical means including loading, transporting unloading rehandling including excavation of dumped floating material working under foul condition (if any) etc. complete to rise eleven bakkarawala, sanitary land fill/authorized dumping ground with all leads and lifts etc. complete upto entire satisfactory of engineer-in-charge. (lead upto 40km)
Sector: Irrigation