Details: earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge. all kinds of soil filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. extra for every additional lif of 1.5 m or part thereof in excavation / banking excavated or stacked materials. all kinds of soil providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - all work up to plinth 1:4:8 (1 cement : 4 coarse sand (zone-ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) providing and laying in position ready mixed o
Sector: PWD