Details: desilting work (pre monsoon)desilting of open drains, covered drains, culverts, pipe drain etc. by taking out silt, sludge, building earth mixed malba, dead animals, plastic bags & all type of floating, solid and semi-soilid malba / etc. from flowing water (including removing and replacing of drain cover) and stacking of waste material / silt / etc. within a lead of 50 meter and for all lifts in or under foul condition including pumping out water if required during desiltng including all required t & ps (disc rope, bamboos, steel road, suitable mechanical device, jcb, oxygen mask, sand bags, pump set, pump operator and diesel etc. required for de-silting) as per direction of engineer-in-charge. the rate includes all the operation as above including working in foul condition and making all road safety measure during the execution of work. the payment of this item will be made on submission of the coloured photographs in two copies at an interval of every 50m of before and after cl
Sector: Industry Development