Details: disposal of moorum/building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of engineer-in-charge mirror polishing on marble work/granite work/stone work where ever required to give high gloss finish complete providing and fixing fly proof galvanized m.s. wire gauge to windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions with wire of dia 0.63 mm all complete with second class teak wood beading 62x19 mm with 12 mm mild steel u beading steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works 12 mm cement plaster of mix 1:6 (1 cement: 6 coarse
Sector: University