Details: disposal of building / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. providing and applying tack coat using bitumen emulsion conforming to is: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. with medium setting bitumen emulsion on w.b.m / w.m.m. @ 0.4kg/sqm on bituminous surface @ 0.25kg/sqm providing and laying dense graded bituminous macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compact
Sector: PWD