Details: disposal of moorum/building /malba/similar unservicable , dismantled or waste material by mechanical transport including loading , transporting , unloading to approved muncipal dumping ground for lead upto 10km for all lifts , complete as per direction of engineer-in-charge reinforced cement concrete work in beams, suspended floors, roofs having up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). centering and shuttering including strutting, propping etc. and removal of form for weather shade, chajjas, corbels etc., including edges steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. thermo-mechanically treated bars of grade fe-500d or more 15 mm
Sector: University