Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge.all kinds of soil filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in:cement mortar 1:6 (1 cement : 6 coarse sand). brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor v level in all shapes and sizes in :cement mortar 1:6 (1 cement : 6 coarse sand) centering and shuttering including strutting, propping etc. and removal of form forfoundations, footin
Sector: PWD