Details: civil work 15.2.1:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge:all kinds of soil 1.1.1_20:disposal of materials by mechanical transport including loading ,unloading and stacking lime ,moorum, building for lead 20 km 6.4.1:brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor
Sector: Municipality