Details: maintenance work 1.1.1_16:disposal of materials by mechanical transport including loading ,unloading and stacking lime ,moorum, building for lead 16 km 110.10:providing and fiving name board made of ms sheet 90x60cm, 1mm thick with frame of ms angle 50x50x6mm, two diagonal braces at the back of the sheet of ms flat 40x6mm, total height of the board above ground level 2.40m, length of legs below ground 0.30m embedded in cc block 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) 30x30x45cm including excavation and removal of surplus earth with in 50m lead, applying priming coat of approved steel primer, painting with synthetic enamel paint of approved quality and lettering with enamel paint of approved colour (one side) as per drawing/direction of engineer-in-charge 19.19.3.1:providing and fixing in position pre-cast r.c.c. manhole cover and frame of required shape and approved quality.h d - 20circular shape 560 mm internal diameter 16.75:providing and lay
Sector: Municipality