Details: patch repair work 15.2.1:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 16.64:providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of engineer-in- charge. 4.1.2:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:1½:3 (1 cement: 1½ coarse sand (zone-iii) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) 1.1.1_14:disposal of materials by mechanical transport including loading ,unloading and stacking lime ,moorum, building for lead 14 km
Sector: Municipality