Details: civil works 15.2.1:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge:all kinds of soil 6.1.2:brick work with common burnt clay f.p.s (non modular) bricks of class designation 7.5 in foundation and plinth in:cement mortar 1:6 (1 cement : 6 coarse sand) 13.4.2:12 mm cement plaster of mix:1:6 ( 1 cement : 6 coarse sand) 13.18:neat cement punning 16.45:providing and fix
Sector: Municipality