Details: pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. disposal of building / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved. add as circulated by cpwd 35.22% cost index deduct as circulated by gnctd (-) 9.50
Sector: Urban Authority