Details: civil work 15.2.1:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 110.18:providing and laying compacted bed of dry brick aggregate of 40/50 mm thick nominal size in required thickness including spreading, well ramming, consolidating and grouting with jamuna sand including finishing smooth etc. complete as per direction of engineer-in-charge (compacted thickness to be measure for the purpose of payment) 19.6.4:providing and laying non-pressure np2 class
Sector: Municipality