Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by engineer-in-charge. all kinds of soil close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete. (measurements to be taken of the face area timbered) : depth exceeding 3 m but not exceeding 4.5 m. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, portland pozzolana/ordinary portland/portland cement, admi
Sector: PWD