Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction ofengineer - in- charge providing and placing in position 125mm mm thick factory made machine batched &machine mixed precast rcc rectangular covers on drains of footpath of varioussizes, of m-25 grade cement concrete for rcc work, including cost of centering,shuttering, reinforcement of 8 mm dia tmt bars of fe 500 grade (@ maximum 100mmc/c on both ways , neat cement punning on finished surface, properly encased on alledges with 1.6 mm thick, 100 mm wide ms sheet duly painted over priming coat,reinforcement to be welded at edges with ms sheet and providing 2 nos. 12 mm diabar for hooks etc i/c cost of cartage, all leads &lift, handling at site etc. all complete as per direction of engineer-in-charge. steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coa
Sector: Urban Authority