Details: taking off, properly storage and refixing of all type of existing blinds after fixing of upvc windows at this floor i/c required t & p etc. as per direction of engineer in charge.note:- 1. responsibility of properly taking out , handling , storage and refixing will be held with the contractor, nothing extra shall be paid on account of any repair work in blinds (if any).2. if any damage occur to blinds by the act of contrac-tors personnel recovery at market rate for the same will be made from contractors bill. taking out of existing ss (grade 304) railing having 50 mm dia of ss pipe at two level 750 mm and 900 mm (without damaging) and fixing it at same place after laying of floor tile i/c making holes, material if required, all complete as per direction and satisfaction of engineer in charge. (nothing will be paid for material required, damages ) taking out of existing wooden railing of circumference 200 mm having 20 mm square bar (without damaging), all complete as per direction and
Sector: Urban Authority