Details: steel work welded in build up sections/ framed work, including cutting, hosting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) in grading, frames, guard bar, ladder railings, brackets, gates and similar works painting with synthetic enamel paint of! approved brand and manufacture of required colour to give an even shade(a) two or more coats on new work over an under coat of suitable shade with ordinary pain of approved brand and manufacture providing & fixing 8mm thick transparent solid polycarbonate sheet on ms tube frame using nut bolt, aluminium ’t’ profile etc all complete as directed by engineer-in-charge.
Sector: Water Resource Department