Details: demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar. supplying & stacking /malba by mechanical transporting including filling up ground depression & consolidation and atring the same upto a lead 5 km and lift upto 1.50 m. supply of earth including royality excavation loading & unloading and carrage by mechanical transport lead upto 5 km and banking excavated earth in layers not exceeding 20cm in depth breaking clods atring rolling each layer with 1/2 tonne roller or wooden or steel rammers and dressing up in embankments for loads flood banks. marginal banks and quide banks or filling up ground depressions and lift upto 1.5m in all kinds of soil. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:4:8 (1 cement : 4 coarse sand : 8 g
Sector: Irrigation