Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.a) all kinds of soil. centering and shuttering including strutting, propping etc. and removal of form work for a) foundations, footings, bases of columns providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, portland pozzolana/ordinary portland /portland cement, admixtures in recommended proportions as per is: 9103 to accelerate / setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per dire
Sector: PWD