Details: paint items : removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : one or more coats on old work applying priming coat: with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia m.s. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with m.s. tubes, m.s. tube challies, m.s. clamps and m.s. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. the scaffolding system shall be stiffened with bracings, runners, connection with the buildi