Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-iii): 10 graded stone aggregate 40 mm nominal size). providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:1½:3 (1 cement: 1½ coarse sand (zone-iii) : 3 graded stone aggregate 20 mm nominal size). "disposal of moorum/ building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of engineer-in-charge. brick work with common
Sector: Industry Development