Details: providing and fixing 2.0m high ms barricading with frame of angle iron 40x40x6mm, every post to be welded with m.s.channel i.s.l.c. 100x50x6.4 mm horizontally i/c making holes in the channel and providing/embedding of 16mm dia round torque bars in the road demolishing cement concrete manually/ by mechanical means and disposal of material within 50m lead as per direction of engineer-in-charge. nominal concrete 1:3:6 or richer mix.(i/c equivalent design mix) demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge. in cement mortar. earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift m, including getting out the excavated soil and disposal of surplus excavated soil as directed,
Sector: Water supply and Sewerage