Details: dismantling the stone masonry in cement mortar including stacking the material with all lifts etc.complete as directed excavation in all kinds of soil including boulders upto 0.6 m diameter ( 0.113 ) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc.,complete with lead up to 1 km and all lifts as directed. excavation in hard murum including boulders upto 0.6 m diameter (0.113 ) for canal, seating of embankment, filter drain / cccccatch water drains etc., and placing the excavated material neatly in dump area or for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead up to 1 km and all lifts as directed excavation in soft rock with
Sector: Water Resource Department