Details: excavation by chiseling by manual operations, pneumatic breaker, hammer, drilling, compressor breaker, jack hammer etc. for foundations, substructures, basements, tanks, sumps, walls, chambers, manholes, poles, pits & general building works in hard rock, reinforced concrete, bituminous macadam for depths/lifts upto 1.5m, including dressing/trimming the sides, leveling of bottoms, manual dewatering, removing rank vegetation, backfilling in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% modified proctor density conforming to relevant is, stacking in measurable heaps for future use within owners space or disposing within an initial lead of 150m as directed, unloading, leveling excluding shoring, strutting etc. complete as directed by engineer-in-charge, loading.note: 1) the rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc. disposal of building / malba / similar unserviceabl
Sector: Industries and Factories