Details: excavation for foundation by mechanical means in earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete.lift upto 0 m to 1.5 m lift upto 1.5 m to 3m providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with crushed sand/grit, ramming, watering etc. complete. providing and laying in situ / ready mix / ready mix m10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based plc with scada enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand) providing and laying in situ / ready mix m-15 plain cement concrete of trap /granite/quartzite/ gneiss metal for cast in citu piers, abutment, returns, wings etc. including provision of "v" shaped false joints t
Sector: RDPR