Details: part : a - lstk for vapour recovery unit (vru) system design, supply, installation, testing, commissioning and operation of vapour recovery system at iocl's sekerkote depot, tripuramanufacture, procurement of materials and bought out components, assembly at shop, painting, testing at manufacturer's works, packing and supply of skid mounted vapour recovery system suitable for class a (flash point below 23 deg. c) petroleum product including supply of all equipment, power/signal/ control cables (from pmcc, control rooms to vru system), cable trays, instrumentation, commissioning spares, mandatory spares, consumable and special tools & tackles, procurement of materials and bought out components, assembly at shop, painting, testing at manufacturer's works, packing, first fill of lubricants, adsorbents, membranes, drawings and documents as per the enclosed technical specifications & data sheets , other codes and standards as applicable. the scope of supply is inclusive of providing design
Sector: Custom1