Description: Air Conditioning work for the Renovation of FO Office First Floor Main Admin Building in campus of YCMOU Nashik Name of Work Air Conditioning work for the Renovation of FO Office First Floor Main Admin Building in campus of YCMOU Nashik
Details: Supplying, erecting, testing and commissioning of 22HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56° C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longerpiping range upto 1000 metre operation in cooling mode with inverter/ digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oilseparator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, interna
Sector: University