Description: Strengthening and modification of compound wall around ACTREC campus Phase 2 Name of Work
Details: Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Providing & laying rubble stone soling using spotless stones below floors roads/pavements etc. mechanically / manually consolidated thickness 225mm with stones vertically handset interstices packed with smaller stone chips, binding with murrum & sprinkling water for proper consolidating and finishing to required levels in quantities as and when required etc. complete all as directed by the Engineer-in-Charge. Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete. Pr
Sector: Medical Education