Details: item description2civil works boq-1 for chittrakotesurface dressing of the ground including removing vegetation and making up undulations and in-equalities not exceeding 15 cms in depth/ height including disposal of upto 1.5 m lift and lead upto 50m (at least 5m away from the dressed area). excavation for all types and sizes of foundations, trenches and drains or for any other purpose including disposal of excavated stuff upto 1.5 m lift and lead upto 50m (at least 5m away from the excavated area), including dressing and leveling of pits.in all type of soil.filling from available excavated stuff (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering with a lead upto 50m and lift upto 1.5mproviding and filling in plinth with sand/ crusher dust and hard moorum under floor in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, including dres
Sector: Industries and Factories