Details: construction of compound wall around pen salt factory office, taluka- pen, district-raigad. excavation work for construction of base wall with stone (as per code no. 2.5 of dsr 2023) filling of soil (excluding rock) in trenches consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. (as per dsr 2023 i no. 2.25.) random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) upto plinth level with (cement mortar 1:6 (1 cement : 6 coarse sand) (as per code no. 7.1 of dsr 2023) random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. (as per code no. 7.2 of dsr 2023) providing and fixing 1mm thick m.s. sheet door w
Sector: Industries and Factories