Details: excavation for foundation / pipe trenches in earth , soils of all types , sand , gravel , soft murum , hard murum , hard murum and boulders , including removing the excavated material upto a distance of 50 mtrs. beyond the area and lifts as below , stacking as directed by engineer - in - charge , normal dewatering , excluding backfilling , etc. complete by all means. excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (bd-a- 6/259) providing isi mark g.i. pipe of following class and dia. excluding gst levied by goi & gom in all respect, inspection charges, transportation to stores, etc. complete as per is-1239/2004.
Sector: RDPR