Description: Construction of shade106 993 Sq Mt Name of Work Construction of Shed for Rice Mill SHED 106 993 Sq Mt
Details: Construction of Shed for Rice Mill SHED – 106.993 Sq. Mt Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Manual Means. Filling in plinth and floors with contractors material/brought from outside and approved by Engineer
Sector: Agriculture