Details: providing pipe line at lonand anu-jati & navbaudh wastil tal:- malshiras. excavation for foundation/pipe trenches in earth, soils, of all types sand, gravel, and soft murum, including removing the excavated material up to a distance of 50 m and lift as below stacking and spreading as directed normal dewatering, preparing the bed for foundation and excluding back filling etc.complete (m.jp d.s.r. 2023-24 item no.1 page no 37) excavation for foundation /pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a lead of 50 m beyond the lift as below,stacking as directed by engineer-in-charge normal dewatering, preparing the bed for foundation and excluding back filling, etc. complete (mjp d.s.r. 2023-24 item no.5page no 37) excavation for foundation /pipe in hard rock by controlled blasting including trimming and leveling the bed by chiseling where necessary and removing the excavated material and stacking it in mea
Sector: RDPR