Details: excavation for catch/side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils.(item no.2.18) supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders /rubble and stacking the broken metal etc. complete . (prior approval of sample stack of broken metal by the ex. engineer is necessary the date of approval will form part of the measurements) a)80 mm metal, by breaking boulders (hand broken). (item no.50.56) supplying hard murum/ kankar at the road site, including conveying and stacking complete. (item no.2.29a) spreading 80/40 mm metal for road work including sectionong etc complete as directed by engineer in charge .(item no.50.58) spreading hard murum/ soft murrum/ gravel or kankar for side width complete (item
Sector: RDPR