Details: item no.1.excavation for foundation in hard murum, including removing the excavated material up to a distance of 50 meters beyond the area and lifts as below, stacking and spreading as directed engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete lift 0.00 to 1.50 item no.2. excavation for foundationin hard murum, and boulders, including removing the excavated material up to a distance of 50 meters beyond the area and lifts as below, stacking and spreading as directed engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. lift 1.50 to 3.0 mt item no.3. excavation for fou
Sector: RDPR