Details: jnpa karal lake beautification and rejuvenation dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (bd-a- 9/261) desilting the supply well, intake well / head works, sump of water supply / sewerage works etc. in wet or dry condition including lifts upto 9 m and lead upto 150 m as required beyond the work site, stacking, spreading, including necessary guarding, etc. complete, as directed by engineer-in-charge. clearing grass and removal of up to a distance of 50 metres out side the periphery of the area . cutting down branches of trees, bushes etc.stacking the material neatly as directed (for motarable road) excavation for foundation in earth, soil of all types,s and, gravel and soft murum, including removing the excavated material upto a distance of 50m.
Sector: Harbor