Details: dismentaling dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc removing of existing doors with door frame, windows , mild steel grill, railing, ventilators, shaft door, false ceiling, partitions , etc as per direction engineer incharge and proposed drawings, item includes lowering down debris at designated marked place which is surrounding covered with green hassian cloth , re usable scrap items to be kept at one place as per instructions engineer in charge. removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, co
Sector: Harbor