Details: dismantling doors, windows and clear storey windows (steel / wood) shutter including chowkhats, architraves, holdfasts etc. complete and stacking within 100 m lead (full windows) of area beyond 3.00 sq.m dismantling stone slab flooring laid in cement mortar including stacking of serviceable materials and disposal of unserviceable materials within 200 m lead dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable surplus material and stacking of serviceable materials within 100 m lead as directed by the engineer-in-charge providing , wall painting with one coat on old work flat oil paint of approved make to give an even shade including preparation of the surfaces, scaffolding complete. as per specifications andas directed by the engineer-in-charge. providing and fixing in position suspended seamless false ceiling system using 12.50 mm thick moisture resistant plain gypsum board (gyproc.mr of m/s. saint gobain make
Sector: Research center