Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area . dsr i.no. 2.07 excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. dsr i>no. 2.11. excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. dsr i.no. 2.18 supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders /rubble and stacking the broken metal etc. complete . (prior approval of sample stack of broken metal by the ex. engineer is necessary the date of approval will for
Sector: RDPR