Details: providing earth work in embankment with approved materials obtained from departmental land upto lead of 50m including all lifts, laying in layers of 20cm to 30cm thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etc. complete (material obtained from departmental land)ssr pg no./it no. 29/2.27 supplying hard murum at the road site including conveying and stacking etc. complete.ssr pg no./it no. 29/2.29a spreding hard murum on the road including sectioning etc. complete.ssr pg no./it no. 30/2.30 compacting hard mururm for side width with power roller including watering etc. complete.ssr pg no./it no. 30/2.31 providing and laying cement concrete pipe of is 458:2003 np-2 class of 600mm diameter in proper line, level and including providing and fixing collars in cement mortar 1:2 and curing etc. complete.ssr pg no./it no. 196/11.09 providing and fix
Sector: RDPR