Details: 1) excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. p/i 29/2.18 119.00 + 10% hilly 2)supplying soft murum at the road site, including conveying and stacking complete. 3) spreading hard murum/ soft murrum/ gravel or kankar for side width complete 4) providing and constructing 50 mm. thick modified macadam (mpm) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10 mt. to achive the desired degree of compaction as per technical specification clause 506 etc. complete. including picking of existing wbm surface.(vg-30 bulk bitumen rates are considered to arri
Sector: RDPR